PCEC
Tracked since by Chubukak2301
Concurrent players
Metrics over time
About & history
+Adding proper railings to the atrium +Fixed the automatic sliding door not operating correctly +Added floor edge molding on the first floor. Removed the ugly tiling. +Added an entryway between the entrance and main hallway -KONE elevator has been removed and will be replaced in the near future -The tilling on the first floor has been removed

